Clearpower design and install a fuel Silo solution for Waterside Park scheme London

January 2012: Clearpower designed and installed a biomass fuel silo storage solution as part of the Waterside park development scheme London. This scheme provides 780 new homes (35% affordable) over an 11.4 acre site.  Clearpower’s unique steel frame silo solution offered a design which did not incur any additional load on the internal walls or ceiling […]